Back to Resources
guides

What level of survey do I need?

By The openmoove team

There are three RICS house survey levels. Level 1 suits newer homes in good condition, Level 2 suits most standard homes, and Level 3 is for older, larger or altered properties. The inspection takes a few hours, and the report usually arrives within three to ten working days depending on the level.

What are the house survey levels?

RICS, the professional body for surveyors, sets three survey levels in the UK:

  • Level 1 Condition Report: a basic summary of condition using a simple traffic light rating. It suits newer, conventional homes in good condition.
  • Level 2 Home Survey: the most popular choice, once called a HomeBuyer Report. It looks in more detail at visible defects and maintenance, and some versions include a valuation. It suits most conventional homes in reasonable condition.
  • Level 3 Building Survey: the most detailed. It covers how the property is built, defects and their causes, repair options and likely costs. It's recommended for older, unusual or heavily altered homes.
Survey levelBest forTypical inspection timeTypical report turnaround
Level 1 (Condition Report)Newer, conventional homes1 to 2 hoursA few working days
Level 2 (Home Survey)Most conventional homes in reasonable condition2 to 4 hours3 to 5 working days
Level 3 (Building Survey)Older, unusual or heavily altered homes4 to 8 hoursUp to 10 working days

Which house survey do I need?

Think about the age, size and condition of the home. A recent new build or modern house in good condition may only need a Level 1. Most homes built in the last century and in reasonable condition suit a Level 2. If the home is older than around 100 years, has been extended or altered, has an unusual construction, or you're planning major work, a Level 3 is the safer choice. If you're unsure, ask the surveyor which level they'd recommend for that property.

Do I need a house survey?

It isn't a legal requirement in England and Wales, but it's strongly recommended for every purchase. Your mortgage lender will arrange a valuation, but that only checks the home is good security for the loan. It isn't a check on condition, so it shouldn't replace a proper survey. A survey can find problems you won't see on a viewing, such as damp, roof defects, structural movement, drainage issues or poor building work.

When should I book a house survey?

As soon as your offer is accepted, usually around the same time as your lender's valuation. Surveyors can be booked up, and booking early gives you time to act on what the report finds before exchange of contracts, when you're still free to renegotiate or walk away.

How long does a house survey take?

According to RICS, the inspection usually takes between two hours and a full day, depending on the level and the size of the home. The written report takes longer: a Level 2 report is commonly back within three to five working days, and a Level 3 often takes closer to ten. Turnaround is set by each surveyor, so ask before you instruct them.

How much does a house survey cost?

It depends on the level, the size and value of the home, and where it is. A Level 1 costs least and a Level 3 costs most. You can compare survey quotes from surveyors we've chosen in the openmoove Marketplace, priced for your address.

What happens if the survey finds a problem?

You can ask the seller for more information, get a specialist to look at it, ask for repairs to be done before completion, or renegotiate the price. In serious cases you may decide not to go ahead. It's a normal part of buying a home, and many issues turn out to be minor. If you're the seller, our guide to what the buyer's survey means for you explains what to expect.

Waiting on a survey report shouldn't mean silence. openmoove keeps buyers, sellers and agents updated the moment a survey is booked and completed, so nobody's left guessing whether it's back yet.

Frequently asked questions

Is a mortgage valuation the same as a survey?

No. The valuation is for your lender and only checks the home is worth what they're lending. A survey is for you and looks at the property's condition.

What's the difference between a Level 2 and a Level 3 survey?

A Level 2 suits conventional homes in reasonable condition and focuses on visible issues. A Level 3 is far more detailed, explains causes and repair options, and is recommended for older, unusual or altered homes.

Do I need a survey on a new build?

A standard survey is less common for new builds, but many buyers get a snagging survey, which checks for unfinished or faulty work before or soon after moving in.

Can I use the seller's survey?

No. A survey is written for the person who instructed it, so you should get your own, even if the seller had one done recently.

This guide is general information for home buyers in England and Wales, not professional surveying advice. Report turnaround times are set by individual surveyors and vary, so confirm timescales directly before instructing one.

Ready for calmer completions?

See how openmoove keeps every move on track.

Book a demo

Cookie Preferences

Choose which cookies you allow. Your choices will be saved and you can change them anytime from the footer.

Strictly Necessary

Required for the site to function. Cannot be disabled.

Session cookie, CSRF protection

Analytics

Help us understand how visitors use the site.

Google Analytics · Cookies: _ga, _ga_W5REQ6CCWW · Third party: Google LLC

Marketing

Enable live chat and lead capture tools.

Pipedrive LeadBooster · Session storage · Third party: Pipedrive OÜ